Puntledge penstock corridor to be closed during hydroelectric work

BC Hydro is prepping to do some hydroelectric work near the Puntledge River.

Spokesperson Stephen Watson says crews will be removing old sections of the concrete penstock, anchor blocks and the old powerhouse building (a.k.a the 25 Cycle Building).

He notes the major reason for the work revolves around public safety. The hydroelectric infrastructure has been around since 1912, and have gone into disrepair over the years, increasing safety hazards.

The BC Hydro Commission, who came before BC Hydro, completed significant upgrades to the hydroelectric system in the 1950s. Once that work was done, some of the old infrastructure that was no longer a part of the new system, was left abandoned.

Watson advises residents to avoid the area while the work is done. “Public safety and worker safety is the main point here,” he says.

The total project cost is around $7 million and the deconstruction work will be completed by the FMI/K’omoks First Nation joint venture.

Watson notes the work is slated to start later this month and last through to the fall.

Access points to areas like the end of Powerhouse Road, or near the Duncan Bay Logging Road, will be closed off starting around mid-June to the end of September and potentially a month or so beyond for the clean-up work.

Justin Goulet
Justin Goulet
News Reporter/Weekend Host - If you've got a news tip, I'd love to hear from you. You can contact me at jgoulet@vistaradio.ca or call the news-line at (250) 331-4033.

Continue Reading

cfcp Now playing play

Related Articles

Latest News

Advocates urge next B.C. government to address water scarcity as El Niño forecast adds to drought concerns

A potentially powerful El Niño could worsen drought conditions across B.C., prompting calls for stronger water protection measures from the next provincial government.

Advocates urge next B.C. government to address water scarcity as El Niño forecast adds to drought concerns

A potentially powerful El Niño could worsen drought conditions across B.C., prompting calls for stronger water protection measures from the next provincial government.

B.C. loses more than 20,000 jobs in September as unemployment rate stays steady

British Columbia lost more than 20,000 jobs in September, sparking a political clash over the province’s economic direction.

B.C. Conservatives propose income tax cuts as NDP, Greens unveil election promises

B.C.'s major political parties are pitching tax cuts, frozen auto insurance rates and education improvements as the provincial election campaign continues.

B.C. Conservatives drop Victoria-Beacon Hill candidate over racist social media posts

The B.C. Conservatives have dropped their Victoria-Beacon Hill candidate after racist social media posts and comments appearing to support violence surfaced.