Be ready to slow down while driving, as road crews work on the Trent River and Condensory bridges.
In a social media post, Mainroad North Island Contracting says crews will perform chip sealing on the bridge decks of Trent River bridge and Condensory Bridge.
You are asked to slow down while driving on both bridges while the work runs.
The work will only be for 2 days, running from August 19 to the 20, from 7:30 a.m. to 4:30 pm. each day.